It’s a single lane in both directions to begin with. And there has been a lot of digging, drilling and repaving since September 2024. The resulting lane closures lead to 10 minute-long pauses in traffic flow during peak hours. And after all the construction only patches of the road get repaved.
Anyone knows what’s up with all this? Is this a failure in the planning or…
submitted by /u/thunta
[link] [comments]
